Storage in cold room at four levels viz., ground and 3 mezzanine.
Total 29 CA Chambers total capacity @4946 MT.
Cold room temperature: 0+ 1.5 Deg. Celsius.
8 normal chambers total capacity 1000 MT
4 Deep Freeze chambers total capacity 1200 MT
Sufficient space earmarked for parking/movement of trucks.
Salient features of the facilities are: Ripening Chambers • 12 Nos. of ripening chambers, total capacity 360 MT.
Size of each chamber is approx. 240 cubic meters.
Temperature of ripening chamber is 10 to 15 +/- 1.5 Deg. Celsius. Or As / requirement.
Pallet racking arrangements for keeping of 82 pallets in each ripening chamber.
Handlling Of Banana at site for ripening.
Day 1
Quality checks on receiving, pre-cooling, ripening, conditioning and dispatch to customers to be done in the active supervision of Ripening In-charge at CPC.
# |
Activity Details |
Pictorial Depiction |
A |
Day 2: Start of Ripening: Check the pulp temperature with pulp thermometer, once it attains 17 oC, start the ethylene gas/liquid/generator for required dosage/shots Dos:
Don’ts:
|
|
B |
End of Gassing (after 24 hrs): Ventilate the room for 1/2 hour by opening the door or through exhaust fans in order to exhaust the Carbon dioxide in ripening chamber Don’ts:
|
Ideal colour during gassing
|
# |
Activity Details |
Pictorial Depiction |
A |
Day 3:
|
Ideal colour at the end of Day-3 |
B |
Day 4:
|
Ideal colour at the end of Day-4 |
C |
Day 5:
|
Ideal colour at the end of Day-5 |
D |
Day 6:
|
Ideal colour at the end of Day-6 and best suited to dispatch the material. |
Storage in cold room at four levels viz., ground and 3 mezzanine. Total 9 no Chambers pacity @150 MT per chamber.
Cold room temperature: 0+ 1.5 Deg. Celsius.
Sufficient space earmarked for parking/movement of trucks.